Our products at a glance:

It's a long way from raw materials through the mixture to the finished stone. Many plant components are involved in this process. Only if the system components are matched, can one be assured of a smooth process and economical operation of the block making plant. Learn about our Concrete block production plants.

It's a long way from raw materials over mixture to the finished (Kerb)stone. Masa Kerbstone presses were developed to fulfill among other criteria, the special requirements of the "British Standard" kerbstones. This "British Standard" is still a condition in countries of the Middle East and the UK. Learn about our Kerbstone production plants.

The manufacturing of autoclaved aerated concrete products demands high standards for mixing and dosing of the aggregates, the control of the fermentation process and the control of each production step. Masa's aerated concrete installations are proven advanced technology processes, designed according to customers specific requirements. This approach allows complete solutions to ensure highly efficient, optimised processes resulting in consistent final product quality. Learn more about our plants for the production of AAC.

It's a long way from raw materials through the mixture to the finished sand lime bricks. Many plant components are involved in this process. Only if the system components are matched, can one be assured of a smooth process and economical operation of the sand lime brick production plant. Learn about our Sand lime brick production plants.

Our service:

Masa plants and machines are installed and commissioned by our own experienced fitters. Masa relies on qualified personnel, trained in Germany. Read more about the assembly and commissioning of your production line.

The Masa Lifetime service extends far beyond the actual assembly and commissioning of a plant. Masa can rely on specific know-how and an industry experience of more than 110 years. Find out more about the wide range of Masa Lifetime services.

Do you need support with your machine? Masa Support scores in both quality and significantly improved accessibility. Whether "first aid" for technical problems, updates, functional expansions of your production plant or technical questions, the know-how provided by Masa Support covers a wide range of services. Get information now.

One of the keys to increasing productivity and quality is continuous training of the machine and maintenance personnel.
The acquired know-how will pay off quickly: You and your employees only know how good a Masa machine or plant actually is, if all functions, tricks and fine adjustments are known. Learn more about Masa Customer training.

Are you looking for your contact? The Masa Service team introduces itself. All contact details can be found here.

Get more information about us:

News from the Masa Group

Latest News and press releases

Extension of the AAC plant in Dnepropetrovsk

12 Sep 2013 - Extension of the AAC plant in Dnepropetrovsk, Ukraine, from a daily capacity of 1000 m³ to 1400 m³ completed.

8th June, 2012

The MASA AAC plant "UDK Gazbeton" started operation at the end of 2010, and in summer 2011 already, the investors decided to extend the production capacity.

Since March 2012, the plant works with a daily capacity of 1400 m³. Right from the start of this project, the possibility for an extension had been considered in the plant layout, so that the actual extension did not cause any problems. The number of autoclaves was increased from six to eight, and the corresponding pulling plants were installed. For a faster loading and unloading of the hardening area, an additional manipulator was installed. All other plant components just required the cycle times to be adapted to the higher capacity.

UDK Gazbeton carried out most of the mechanical and electrical installation works of the additional plant components themselves, based on instructions given by MASA GmbH. All these works were carried out parallel to the normal production process, so there was hardly any loss of production.

Such a smooth process is only possible when both partners harmonize. Here, the MASA concept to name a project manager directly after conclusion of the contract who is responsible for the technical conducting of the project and keeping into touch with the customer worked out.

In this case, the UDK team closely cooperated with the MASA project manager Mr Frank Schubert. Thus, excellent results could be achieved in the shortest possible time.

Further information, provided by UDK, can be found on www.youtube.com under "UDK Gazbeton".